Network design

Network planning and design is an iterative process, encompassing topological design, network-synthesis, and network-realization, and is aimed at ensuring that a new telecommunications network or service meets the needs of the subscriber and operator.[1] The process can be tailored according to each new network or service.[2]

A network planning methodology

A traditional network planning methodology involves five layers of planning, namely:

  • business planning
  • long-term and medium-term network planning
  • short-term network planning
  • IT asset sourcing
  • operations and maintenance.[1]

Each of these layers incorporates plans for different time horizons, i.e. the business planning layer determines the planning that the operator must perform to ensure that the network will perform as required for its intended life-span. The Operations and Maintenance layer, however, examines how the network will run on a day-to-day basis.

The network planning process begins with the acquisition of external information. This includes:

  • forecasts of how the new network/service will operate;
  • the economic information concerning costs; and
  • the technical details of the network’s capabilities.[1][2]

Planning a new network/service involves implementing the new system across the first four layers of the OSI Reference Model.[1] Choices must be made for the protocols and transmission technologies.[1][2]

Network planning process involves three main steps:

  • Topological design: This stage involves determining where to place the components and how to connect them. The (topological) optimisation methods that can be used in this stage come from an area of mathematics called Graph Theory. These methods involve determining the costs of transmission and the cost of switching, and thereby determining the optimum connection matrix and location of switches and concentrators.[1]
  • Network-synthesis: This stage involves determining the size of the components used, subject to performance criteria such as the Grade of Service (GoS). The method used is known as "Nonlinear Optimisation", and involves determining the topology, required GoS, cost of transmission, etc., and using this information to calculate a routing plan, and the size of the components.[1]
  • Network realization: This stage involves determining how to meet capacity requirements, and ensure reliability within the network. The method used is known as "Multicommodity Flow Optimisation", and involves determining all information relating to demand, costs and reliability, and then using this information to calculate an actual physical circuit plan.[1]

These steps are performed iteratively in parallel with one another.[1][2]

The role of forecasting

During the process of Network Planning and Design, estimates are made of the expected traffic intensity and traffic load that the network must support.[1] If a network of a similar nature already exists, traffic measurements of such a network can be used to calculate the exact traffic load [2]. If there are no similar networks, then the network planner must use telecommunications forecasting methods to estimate the expected traffic intensity.[1]

The forecasting process involves several steps:[1]

  • Definition of problem;
  • Data acquisition;
  • Choice of forecasting method;
  • Analysis/Forecasting;
  • Documentation and analysis of results.

Dimensioning

Dimensioning a new network determines the minimum capacity requirements that will still allow the Teletraffic Grade of Service (GoS) requirements to be met.[1][2] To do this, dimensioning involves planning for peak-hour traffic, i.e. that hour during the day during which traffic intensity is at its peak.[1]

The dimensioning process involves determining the network’s topology, routing plan, traffic matrix, and GoS requirements, and using this information to determine the maximum call handling capacity of the switches, and the maximum number of channels required between the switches.[1] This process requires a complex model that simulates the behavior of the network equipment and routing protocols.

A dimensioning rule is that the planner must ensure that the traffic load should never approach a load of 100 percent.[1] To calculate the correct dimensioning to comply with the above rule, the planner must take on-going measurements of the network’s traffic, and continuously maintain and upgrade resources to meet the changing requirements.[1][2] Another reason for "overprovisioning" is to make sure that traffic can be rerouted in case a failure occurs in the network.

Because of the complexity of network dimensioning, this is typically done using specialized software tools. Whereas researchers typically develop custom software to study a particular problem, network operators typically make use of commercial network planning software.

Traffic engineering

Compared to network engineering, which adds resources such as links, routers and switches into the network, traffic engineering targets changing traffic paths on the existing network to alleviate traffic congestion or accommodate more traffic demand.

This technology is critical when the cost of network expansion is prohibitively high and network load is not optimally balanced. The first part provides financial motivation for traffic engineering while the second part grants the possibility of deploying this technology.

The available technologies for traffic engineering include MPLS and ATM for current Internet backbone. For example, MPLS allows carriers to provision LSPs with dynamic or explicit routes. The dynamic routes is controlled by CSPF while the explicit routes are optimized in an offline tool or through a path computation element which is under study by IETF. Fast reroute has been implemented by major vendors, such as Cisco and Juniper Networks, to provide localized resilient capability for MPLS networks. End-to-end protection is an alternative resilient approach. It provisions a backup route for each primary route. Pre-planning enough bandwidth for these backup routes is one of the active topics for survivable network design.

Provisioning a large number of LSPs also brought up a scalability problem. Various solutions have been proposed and it is still an active topic under study.

Survivability

Network survivability enables the network to maintain maximum network connectivity and quality of service under failure conditions. It has been one of the critical requirements in network planning and design. It involves design requirements on topology, protocol, bandwidth allocation, etc.. Topology requirement can be maintaining a minimum two-connected network against any failure of a single link or node. Protocol requirements include using dynamic routing protocol to reroute traffic against network dynamics during the transition of network dimensioning or equipment failures. Bandwidth allocation requirements pro-actively allocate extra bandwidth to avoid traffic loss under failure conditions. This topic has been actively studied in conferences, such as the International Workshop on Design of Reliable Communication Networks DRCN.

References

This article was sourced from Creative Commons Attribution-ShareAlike License; additional terms may apply. World Heritage Encyclopedia content is assembled from numerous content providers, Open Access Publishing, and in compliance with The Fair Access to Science and Technology Research Act (FASTR), Wikimedia Foundation, Inc., Public Library of Science, The Encyclopedia of Life, Open Book Publishers (OBP), PubMed, U.S. National Library of Medicine, National Center for Biotechnology Information, U.S. National Library of Medicine, National Institutes of Health (NIH), U.S. Department of Health & Human Services, and USA.gov, which sources content from all federal, state, local, tribal, and territorial government publication portals (.gov, .mil, .edu). Funding for USA.gov and content contributors is made possible from the U.S. Congress, E-Government Act of 2002.
 
Crowd sourced content that is contributed to World Heritage Encyclopedia is peer reviewed and edited by our editorial staff to ensure quality scholarly research articles.
 
By using this site, you agree to the Terms of Use and Privacy Policy. World Heritage Encyclopedia™ is a registered trademark of the World Public Library Association, a non-profit organization.
 


Copyright © World Library Foundation. All rights reserved. eBooks from Project Gutenberg are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.