Thessaloniki Metro

Thessaloniki Metro
Overview
Native name Μετρό Θεσσαλονίκης
Owner Attiko Metro A.E.
Locale Thessaloniki Urban Area
Transit type Rapid transit/Light metro
Number of lines 1 (2018)
2 with extensions (when finished)
Number of stations 18 (2018)
35 (when finished)
Operation
Operation will start 2018[1]
Number of vehicles 18 AnsaldoBreda Driverless Metro
Technical
System length 9.6 km (6.0 mi) (2018)
33 km (21 mi) (when finished)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Thessaloniki Metro map

The Thessaloniki Metropolitan Railway (Greek: Μητροπολιτικός Σιδηρόδρομος Θεσσαλονίκης Metropolitikós Sideródromos Thessaloníkes), or Thessaloniki Metro (Greek: Μετρό Θεσσαλονίκης Metró Thessaloníkis), is an underground rapid transit system that is under construction in Thessaloniki, Greece.

Contents

  • Background 1
  • The project 2
    • Progress 2.1
    • Stations planned 2.2
      • Phase 1 (under construction) 2.2.1
    • Park and ride 2.3
  • Future lines and extensions 3
    • Phase 2 3.1
    • Phase 3 3.2
  • Gallery 4
  • See also 5
  • References 6
    • Sources 6.1
  • External links 7

Background

The first to suggest an underground railway system for Thessaloniki was Ernest Hébrard[2] during the redesign of the city in the early 1920s, to allow easy access from the city's downtown to the planned outskirts of the city (now Kalamaria).

The idea for constructing a metro was only seriously considered in the 1980s and it took almost 20 years for the official groundbreaking works to start. This was due to a series of failed contract competitions and several appeals against awarded contracts. A previous attempt to construct an underground mass transit system in Thessaloniki took place in 1986-1988, when a short cut-and cover tunnel was constructed along a part of Egnatia Avenue near the University, but failed because it was underfunded.

The project

The construction of the much awaited Thessaloniki metro started in June 2006 and should be completed by 2018.[1] The project has been substantially delayed by significant archeological discoveries[3] during its construction which have been responsible for delaying the project for up to three years or more.[4]

The first phase of the project consists of 9.6 kilometres (6.0 mi) of underground line (with twin tunnels), 13 stations along its length, and a depot at the southeast end of the line. The total budget for the project is about 1.1 billion euro. Part of the budget (€250 million) is funded from the 3rd CSF and a loan for €250 million has been arranged with the European Investment Bank.

Phase 2 of the project was approved to begin construction prior to the operation of the Phase 1 line and in May 2009 Attiko Metro put to tender for the construction of the extension to Kalamaria. Attiko Metro claims this will prevent the construction of the transfer stations from interrupting the basic line operation.[5]

Thessaloniki's metro will share many similarities with the Copenhagen Metro which operates as a light metro. It will feature 18 AnsaldoBreda Driverless Metro trains that will run in separate tunnels in each direction, while each station will feature glass walls with automatic doors on the edge of platforms, for added safety. The project is being constructed by a Greek-Italian consortium and overseen by Attiko Metro, the company that manages the Athens Metro.

Progress

Considerable progress has been made to the construction of the metro system since work began in 2006. Overall, 7.2 km of tunnels have been dug underneath the city, 3.8 for direction A and 3.04 for direction B.[6] As the overall length of a single tunnel is estimated to be 9.6 km, 37.5% of the entire network has already been dug. As of 2015, the following progress has been made to the stations on Phase 1 of the construction.

Station Construction site Diaphragmatic walls Archaeological exc. Station construction Station formation
New Railway Station
Dimokratias
Venizelou
Agias Sofias
Sintrivani
Panepistimio (University)
Papafi[7]
Eukleidi[8]
Fleming
Analipseos
Patrikiou
Voulgari
Nea Elvetia
  •      Completed
  •      Underway
  •      Not started

Stations planned

Phase 1 (under construction)

Thessaloniki Metro (Phases 1&2)
Line length: 19.6 km (12.2 mi)
Track gauge: 1,435 mm (4 ft 8 12 in)
Efkarpia
Polichni
Stavroupoli
Pavlou Mela
New Railway Station
Neapoli
Dimokratias
Venizelou
Agias Sophias
Sintrivani
Panepistimio
Papafi
Efkleidi
Fleming
Analipseos
Patrikiou
Nomarchia (to be renamed)
Voulgari
Kalamaria
Nea Elvetia
Aretsou
Pylaia Depot
Nea Krini
Mikra
  • New Railway Station
  • Dimokratias
  • Venizelou
  • Aghia Sofia
  • Sintrivani
  • Panepistimio (University)
  • Papafi
  • Efklidi
  • Fleming
  • Analipseos
  • Patrikiou
  • Voulgari
  • Nea Elvetia

Park and ride

Several park and ride facilities are planned to facilitate the large number of vehicular commuters in the city. These include two facilities at the New Railway Station with four underground levels of 450 and 600 parking spaces, 1,000 underground spaces shared over four levels at the Panepistimio (University) station and 650 underground spaces over one level at the Nea Elvetia station. A total of 3,700 park and ride spaces have been planned for Phase 1 of the project.[9]

Future lines and extensions

Phase 2

Construction of the Phase 2 extension to Kalamaria (to the southeast) started in summer 2014. Tenders for the Phase 2 Stavroupoli extension, to Efkarpia (to the north), have not been called for yet.

Phase 3

Thessaloniki Metro (Phases 1, 2 & 3)
Track gauge: 1,435 mm (4 ft 8 12 in)
Papageorgiou
Kordelio/Evosmos
Efkarpia
Evosmos
Polichni
Menemeni
Stravroupoli
Ampelokipoi
Pavlou Mela
New Railway Station
Neapoli
Dimokratias
Venizelou
Agias Sophias
Sintrivani
Panepistimio
Papafi
Efkleidi
Fleming
Toumba
Analipseos
Patrikiou
Charilaou
Nomarchia (to be renamed)
Voulgari
Kalamaria
Nea Elvetia
Aretsou
Pylaia Depot
Nea Krini
Mikra
Macedonia International Airport

Phase 3 includes the proposals for further extensions to the Northwest and the Southeast.

Construction on this phase shall begin right after phase 2, with a completion date looking at around 2020, were it has been announced that by then the city will operate 33 km (21 mi) of metro line.

  • Toumpa branch (branches off at Panepistimio Station)

Gallery

See also

References

  1. ^ a b Timos Fakalis (18 September 2012). Θεσσαλονίκη: Στα σκαριά τραμ και ενοικιαζόμενα ποδήλατα [Thessaloniki: The tram works and rental bikes]. www.agelioforos.gr (in Greek). Retrieved 18 September 2012. 
  2. ^ Γερολύμπου, Αλεξάνδρα, Η Ανοικοδόμηση της Θεσσαλονίκης Μετά την Πυρκαγιά του 1917, B Έκδοση, University Studio Press, Αριστοτέλειο Πανεπιστήμιο Θεσσαλονίκης, Θεσσαλονίκη 1995.
  3. ^ Giorgos Christides (13 March 2013). "Thessaloniki metro: Ancient dilemma for modern Greece". BBC News. Retrieved 3 July 2013. 
  4. ^ "Thessaloniki metro ruins need more money, time". ekathimerini.com. 25 March 2014. Retrieved 3 July 2013. 
  5. ^ Thessaloniki Metro Extensions
  6. ^ http://www.ametro.gr/page/default.asp?la=1&id=8
  7. ^ Attiko Metro A.E. (31 March 2011). """Συμφωνία για άμεση κατασκευή του σταθμού "Παπάφειο. Retrieved 11 April 2011. 
  8. ^ Attiko Metro A.E. (10 March 2011). "Δηλώσεις του Υφυπουργού κ. Γιάννη Μαγκριώτη στο Σταθμό ΕΥΚΛΕΙΔΗΣ του ΜΕΤΡΟ". Retrieved 11 April 2011. 
  9. ^ Attiko Metro

Sources

  • Archived information
  • Thessaloniki Metro and the Athens Metro Extensions (Greek Ministry of Environment, Physical Planning and Public Works press release 2006-02-20)
  • Conclusion of contract for the Thessaloniki metro (Greek Ministry of Environment, Physical Planning and Public Works press release 2006-04-07)

External links

Media related to at Wikimedia Commons

  • Attiko Metro S.A. - Thessaloniki Metro
    • Maps
    • Maps: [3] [4] (Greek)
  • UrbanRail.NetThessaloniki Metro at
This article was sourced from Creative Commons Attribution-ShareAlike License; additional terms may apply. World Heritage Encyclopedia content is assembled from numerous content providers, Open Access Publishing, and in compliance with The Fair Access to Science and Technology Research Act (FASTR), Wikimedia Foundation, Inc., Public Library of Science, The Encyclopedia of Life, Open Book Publishers (OBP), PubMed, U.S. National Library of Medicine, National Center for Biotechnology Information, U.S. National Library of Medicine, National Institutes of Health (NIH), U.S. Department of Health & Human Services, and USA.gov, which sources content from all federal, state, local, tribal, and territorial government publication portals (.gov, .mil, .edu). Funding for USA.gov and content contributors is made possible from the U.S. Congress, E-Government Act of 2002.
 
Crowd sourced content that is contributed to World Heritage Encyclopedia is peer reviewed and edited by our editorial staff to ensure quality scholarly research articles.
 
By using this site, you agree to the Terms of Use and Privacy Policy. World Heritage Encyclopedia™ is a registered trademark of the World Public Library Association, a non-profit organization.
 


Copyright © World Library Foundation. All rights reserved. eBooks from Project Gutenberg are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.