Chandigarh Metro is a proposed rapid transit system for the city and union territory of Chandigarh in India.[2][3][4]
Delhi Metro Rail Corporation (DMRC) submitted the detailed project report of the Chandigarh Metro Project to Punjab Governor and UT administrator Shivraj Patil on 16 August 2012.[5]
The main motivation for the setting up of Chandigarh Metro is that the population of Chandigarh Urban Complex (CUC) has been growing at a rate of over 5% per year in the last decade. There has also been a phenomenal growth in the number of vehicles in this period and their rising use due to rising household incomes since Chandigarh has the highest per capita income in the country. Beside this, there has been a sharp rise in the population of the nearby towns which has put a lot of pressure on the public transport system. In the absence of adequate and quality mass transport system, people are using the personalised modes which is not only leading to congestion on road network but also increasing environmental pollution.
Road network is enough for now but main travel corridors are beginning to become congested. Travel speeds are declining on the major roads which have limited scope of widening. This indicates the need for judicious use of the available road space. Thus there is need to optimise the available capacity by adopting transport system management measures.
Many junctions particularly on Madhya Marg, Himalaya Marg, Dakshin Marg, Jan Marg, Purv Marg, Udyogpath etc. have very high traffic volumes and most of the junctions with rotaries have exceeded their capacity. With expected growth of traffic, the situation at these junctions is likely to deteriorate fast.
Parking is assuming critical dimensions in Chandigarh particularly in Sector 17. Parking facilities need to be augmented substantially. Hence there is a need for an alternative mode of transportation to reduce the congestion of parking spaces.
In the first phase, a 37.573 km metro rail network will be built of which 23.468 km will be elevated and 14.105 km underground Corridor. It will run from north to south. It will start near Capitol Complex and will go up to Mohali. Corridor II, also known as East West Corridor, will start from Sector 21, Panchkula and reach up to Mullanpur.[6][7]
The proposed routes for the various corridors of the metro network are as follows:
The project is expected to cost 113.75 billion (US$1.8 billion), out of which 89.95 billion (US$1.5 billion) will be borne by Chandigarh Administration, 16.8 billion (US$270 million) will be borne by Punjab Govt. and the remaining 7 billion (US$110 million) by Haryana Govt. The expected cost of the metro elevated section is 1.4 billion (US$23 million) per Km and that of the metro underground section is 3.5 billion (US$57 million) per Km. The metro will be completed in two phases. The estimated cost of Phase-I is 89.95 billion (US$1.5 billion) and that of Phase-II is 23.8 billion (US$390 million).
The vision behind the metro system is a well contained city with efficient people friendly transport system with minimum travel time & maximum safety and comfort. The main points of the envisaged vision are:
Reserve Bank of India, Hindi, Odia language, Sanskrit, Bhutan
Haryana, Delhi, Indian National Congress, India, Jaipur
New York City Subway, London Underground, Public transport, Paris Métro, Tram
India, Delhi, Kolkata, Mumbai, Chennai
Indian rupee, Kolkata Metro, Bombardier Transportation, Rapid transit in India, Delhi Airport Metro Express
Delhi Metro, Chennai Metro, Rapid transit, India, Kerala
Punjab, India, Haryana, Chandigarh, Himachal Pradesh, India
Coimbatore, Tamil Nadu, Chennai Metro, India, Namma Metro